aktualita115
Green Energy for Sport

A conference was held in Poland at the end of March 2024, where IVITAS GREEN POWER Director, Petr Machej, provided details on our Capstone C65 microturbine with gas pack and heat exchanger that was installed and commissioned in December 2023 at Wojewódzki Ośrodek Sportu i Rekreacji in the Polish city of Drzonków.

 

03.04.2024
aktualita214
A Capstone turbine C65 is up and running in Poland!

IVITAS GREEN POWER is proud to announce the successful launch of their first international project!

10.01.2024
aktualita313
We wish you a sustainable Xmas and a powerful New Year!
Ivitas GREEN POWER
19.12.2023
aktualita412
Capstone Microturbines presented at the CZ Biom Conference

IVITAS GREEN POWER Commercial Director, Petr Machej, attended the CZ Biom Conference last week, where he gave a well-received presentation about CAPSTONE microturbines. Topics covered in his presentation included utilization of Capstone microturbines in biogas plants, the differences between piston engines and microturbines for Combined Heat and Power (CHP), and the future development of microturbines that use biomethane as a fuel, among others.

22.11.2023
aktualita511
Harness your power and utilize heat with CAPSTONE Microturbines!
We're excited to announce a new series of posts on our social media channels that will focus on innovative applications that utilize CAPSTONE Microturbines! We’ll be taking deep dives into the unique ways CAPSTONE Microturbines can become an efficient and reliable part of cogeneration processes that are normally not feasible for piston engines.
20.04.2023
aktualita610
3 x 65 kWe CAPSTONE microturbines for a paper company

In mid-March 2023, we secured a building permit for the installation of CAPSTONE microturbines (electricity output of 3 x 65 kW) on the grounds of a paper product manufacturer for the food and machinery industries.

23.03.2023
aktualita79
Merry Christmas and Happy New Year!
May you have many successful professional and personal projects in 2023!
21.12.2022
aktualita88
Service contract for 3 x 65 kWe CAPSTONE microturbines

We entered into an agreement (effective from 1 July 2022) with our new customer, Depos Horni Sucha, to provide service for their 3 x 65 kWe CAPSTONE microturbines.

31.05.2022
aktualita97
Building permit documentation for a new CAPSTONE microturbine installation
In cooperation with our parent company IVITAS, we’ve started work on project documentation for the issuance of a building permit for a new installation of three CAPSTONE microturbines with an output of 3 x 65 kWe.
25.05.2022
aktualita106
Successful overhaul of CAPSTONE C200 microturbine

In accordance with the terms of a recently concluded service contract with our client WEPPLER FILTER, we performed the planned overhaul of a CAPSTONE C200 turbine with an electrical output of 200 kW. The turbine is located on the premises of WEPPLER FILTER. 

18.05.2022
1-10 | 11-20 | All